Northwest Redwater Auxiliary API Plan Systems
Designed, fabricated and factory tested 320 various API plan systems complete with instrumentation for Unit 10, 20, 30 and 90 portions.
Designed, fabricated and factory tested 320 various API plan systems complete with instrumentation for Unit 10, 20, 30 and 90 portions.
Installation and commissioning of a 5MMBTU line heater complete with field piping, valving, electrical connection and vessel commissioning.
Designed, fabricated and supplied burners, blowers, modular piping and burner management control systems.
Completed as-built drawings for mechanical, piping, instrumentation, electrical, fire hydrant and cathodic protection layout drawings.
Upgrade of burner control system to a full safety control system, complete with required instrumentation, valving and piping.
Supply of four new pump packages for expansion of the South Liquid Hub, including emulsion to standard pump and water injection pump packages.